Abu Dhabi MRV reporting requirements cover facilities in specified sectors with annual direct Scope 1 emissions of at least 25,000 tonnes of CO₂ equivalent (tCO₂e). Mandatory independent verification begins in 2027 with Reporting Year 2026; covered-sector facilities below the threshold must still submit one complete year of data to establish applicability. EAD MRV Portal
For a plant in Mussafah, an oil installation in Ruwais or a road-fleet base in Al Dhafra, the starting question is facility applicability—not the corporate group’s combined footprint. Operators need traceable emissions records, not simply an annual estimate.
What does EAD Resolution No. 03 of 2026 change?
The Environment Agency – Abu Dhabi (EAD) resolution strengthens emissions measurement, reporting and verification, including operator obligations and verifier registration and accreditation. The official announcement, dated 21 September 2026, requires verification by verifiers registered and accredited with EAD. Abu Dhabi Media Office
That date is the announcement date; a separate issuance date and the complete resolution text were not independently established from the retrieved materials. Its provisions are therefore described here through the official announcement and operational guidance—not an assumed article-by-article legal review.
The programme predates this announcement. EAD identifies its establishment in 2024; its March 2026 workshop identifies 2025 as the first reporting cycle. EAD Portal · EAD Workshop
Article 6 of Federal Decree-Law No. (11) of 2024 requires designated sources to measure emissions, prepare inventories and submit periodic reports. EAD implements Abu Dhabi’s facility system as competent authority, coordinating within the federal framework involving the Ministry of Climate Change and Environment (MOCCAE). UAE Legislation · EAD
Abu Dhabi MRV reporting requirements: which facilities qualify?
Applicability combines location, sector and facility-level emissions. It does not automatically cover every business in Abu Dhabi.
Parameter | Current EAD framework | Business implication |
Geography | Abu Dhabi | Assess physical facility location |
Sectors | Industry; power/electricity and water; oil and gas; transport | Check full technical definitions |
Reporting boundary | Individual facility, operational control | Do not aggregate separate facilities |
Threshold | ≥25,000 tCO₂e annual Scope 1 | Not corporate Scope 1–3 totals |
Current gases | CO₂ and CH₄ | Identify both source types |
Reporting period | Calendar year | Keep annual source records |
Responsibility | Operator | Assign accountable personnel |
Verification | Mandatory from 2027 for 2026 data | Prepare supporting evidence |
Voluntary participation | Subject to EAD approval | Obtain agreement first |
Industry covers material transformation and associated combustion; power includes electricity generation and desalinated-water production/distribution. Oil and gas covers activities from exploration through processing, storage and transmission. Transport covers road/rail fleets operating from an Abu Dhabi fixed base; aviation and marine transport are excluded. Standalone service businesses are excluded, but auxiliary activities supporting covered operations require boundary assessment. EAD MRV Portal
Below-threshold facilities in covered sectors must submit at least one complete year using EAD’s template. Verification is not required solely to demonstrate below-threshold status; data accuracy remains the operator’s responsibility. Outside-scope participation is voluntary and requires EAD approval. EAD MRV Portal
The operator may be an owner, lessee or delegated controller. Relevant legal, financial, operational and technical decision-making authority matters; property ownership alone does not determine responsibility. EAD Technical Guidance
Which emissions belong in the inventory?
The current facility template covers direct Scope 1 CO₂ and CH₄—not a complete corporate Scope 1, 2 and 3 inventory.
Scope | Meaning | Example | Current EAD treatment |
1 | Direct owned/controlled sources | Boiler fuel, process CO₂, methane leaks | CO₂/CH₄ within applicable boundary |
2 | Purchased energy emissions | Electricity, steam, heat, cooling | Outside current facility template |
3 | Other value-chain emissions | Purchased goods, business travel | Outside current facility template |
A broader carbon footprint serves different needs:
Area | EAD facility MRV | Corporate carbon footprint |
Purpose | Regulatory reporting | Corporate emissions management/disclosure |
Basis | EAD requirements | Selected standards and reporting obligations |
Boundary | Facility operational control | Defined organisational/value-chain boundary |
Applicability | Sector/threshold conditions | Reporting objective or applicable obligation |
Scopes | Current Scope 1 | May cover Scopes 1–3 |
Gases | Current CO₂/CH₄ | Broader applicable GHG coverage |
Method | EAD guidance/template | GHG Protocol/ISO-aligned accounting |
Audience | EAD | Management, customers, investors |
Verification | EAD transition and eligibility rules | Applicable programme/assurance requirements |
Use | Facility compliance | Strategy, disclosure, reductions |
Neither inventory automatically replaces the other. ISO 14064-1 supports organisational inventories; the GHG Protocol Corporate Standard and supplementary guidance support corporate accounting. ISO 14064-1 · GHG Protocol
What is an emissions measurement plan?
A monitoring plan explains how the facility identifies, measures or calculates, controls and records its emissions. It is not the completed annual emissions report.
EAD’s currently linked guidance—Revision 02, 27 February 2026—calls for facility descriptions, emission sources, methods, data collection, equipment, QA/QC and record-keeping. It specifies submission within 90 days of registration, subsequently by 31 March annually, and revised plans within 30 days of significant changes. Confirm transition-specific audit arrangements with EAD. EAD Technical Guidance
Assign a data owner to each source and document factors, units, assumptions and change controls. Use current EAD guidance and the official template rather than inventing a mandatory plan format.
How should facilities collect and calculate emissions?
Map boilers, furnaces, generators, process equipment, fleet fuel use and relevant methane sources. Gather consumption records, meter readings and applicable production/material data. Depending on methodology, evidence may include invoices, stock reconciliations, calibration certificates, laboratory results and operating logs; not every example is universally mandatory.
EAD guidance supports calculation-based methods using activity data and factors; measurement-based methods using emissions concentration and flow; and mass balances tracking carbon inputs and outputs. Justified fallback approaches have conditions. Select methods for the actual sources, document them in the monitoring plan and prevent double-counting. EAD Technical Guidance
Common readiness gaps include purchases mistaken for consumption, omitted generators, inconsistent units, unsupported factors, expired calibration and undocumented spreadsheet changes. Address them through reconciliation, source registers, factor references, equipment checks and version-controlled calculations.
When are reports and verification due?
The standing guidance requires annual submission by 31 March. Reporting Year 2026 means emissions during 2026, submitted in 2027—not a March 2026 submission.
Date/period | Development | Business significance |
2024 | EAD system established; federal law issued | Earlier programme foundation |
2025 | First reporting cycle identified by workshop | Programme predates resolution |
31 March 2026 | Standing deadline for 2025 emissions | Historical deadline |
21 September 2026 | Resolution announcement published | Verification framework strengthened |
Reporting Year 2026 | First mandatory-verification reporting year | Verification applies in 2027 |
31 March 2027 | Deadline under standing annual rule | Recheck EAD for updated instructions |
EAD Guidance · EAD Workshop · Official Announcement
The March 2026 workshop mentioned grace through 14 April. Do not assume this extension applies in 2027. The portal submission form still references Reporting Year 2025 and earlier backfill: confirm when EAD enables the 2026 cycle. EAD Workshop · EAD Portal
Register facility/contact details, download current files and submit one template per facility per reporting year. EAD treats submitted information as confidential; the operator retains responsibility for its integrity. EAD MRV Portal
Who can independently verify the report?
Use a verifier meeting EAD’s applicable registration, accreditation, competence and independence requirements. External accreditation and EAD scheme eligibility are separate checks; a consultancy or general ISO certificate does not establish approval.
ISO 14065 addresses verification bodies, ISO/IEC 17029 their general conformity-assessment requirements, and ISO 14064-3 verification of GHG statements. The February guidance also recognises a specified MOCCAE-list route; confirm its continuing acceptance and the verifier’s current sector scope with EAD before appointment. The complete post-resolution registration procedure was not established from the retrieved public materials. EAD Guidance · ISO 14065 · ISO 14064-3
Inventory preparation and internal validation are not independent verification.
What should businesses do now?
Use this readiness sequence:
- Screen each facility’s location, sector, operator and annual emissions.
- Establish boundaries and map CO₂/CH₄ sources.
- Document monitoring methods and responsible data owners.
- Collect activity data and reconcile supporting evidence.
- Calculate emissions; review units, factors and completeness internally.
- Engage an eligible verifier early and resolve findings before final submission.
- Submit through EAD’s current process; maintain correction logs and records.
Verification must support the submitted report where required—not become an after-submission formality. Article 6 requires designated sources to retain measured-emissions records for five years from each analysis. Use the companion applicability/readiness checklist below as an internal aid, not regulatory approval. UAE Legislation, Article 6
How QRServes can support preparation
QRServes Global LLC combines Quality, Regulatory, Sustainability and Training services, with Dubai-based operations. Its sustainability reporting service confirms Scope 1–3 inventories following the GHG Protocol Corporate Standard and ISO 14064-1. Its sustainability consulting and sustainability training support broader capability development.
These verified services provide a basis for discussing facility data preparation, documentation and readiness needs under an agreed engagement scope. They do not establish EAD authorisation or independent-verifier status. Corporate ESG framework selection is also distinct from facility reporting.
1. What is Abu Dhabi Resolution No. 03 of 2026?
An EAD instrument strengthening GHG MRV, operator obligations and verifier registration/accreditation.
2. Which facilities must follow the MRV framework?
Abu Dhabi facilities in covered sectors meeting the ≥25,000 tCO₂e annual Scope 1 threshold, with additional below-threshold applicability submissions
3. Does the framework apply to every Abu Dhabi business?
No. Sector, location and applicability conditions matter; standalone service activities are excluded.
4. What does 25,000 tCO₂e mean?
The annual direct-emissions threshold, expressed as tonnes of CO₂ equivalent—not energy consumption or turnover.
5. Facility or corporate threshold?
Facility level. Consolidated group totals do not replace separate facility assessments.
6. Can QRServes help?
Its verified inventory, reporting, consulting and training capabilities support a preparation discussion—not a claim of accredited verification.