Abu Dhabi MRV reporting requirements cover facilities in specified sectors with annual direct Scope 1 emissions of at least 25,000 tonnes of CO₂ equivalent (tCO₂e). Mandatory independent verification begins in 2027 with Reporting Year 2026; covered-sector facilities below the threshold must still submit one complete year of data to establish applicability. EAD MRV Portal

For a plant in Mussafah, an oil installation in Ruwais or a road-fleet base in Al Dhafra, the starting question is facility applicability—not the corporate group’s combined footprint. Operators need traceable emissions records, not simply an annual estimate.

What does EAD Resolution No. 03 of 2026 change?

The Environment Agency – Abu Dhabi (EAD) resolution strengthens emissions measurement, reporting and verification, including operator obligations and verifier registration and accreditation. The official announcement, dated 21 September 2026, requires verification by verifiers registered and accredited with EAD. Abu Dhabi Media Office

That date is the announcement date; a separate issuance date and the complete resolution text were not independently established from the retrieved materials. Its provisions are therefore described here through the official announcement and operational guidance—not an assumed article-by-article legal review.

The programme predates this announcement. EAD identifies its establishment in 2024; its March 2026 workshop identifies 2025 as the first reporting cycle. EAD Portal · EAD Workshop

Article 6 of Federal Decree-Law No. (11) of 2024 requires designated sources to measure emissions, prepare inventories and submit periodic reports. EAD implements Abu Dhabi’s facility system as competent authority, coordinating within the federal framework involving the Ministry of Climate Change and Environment (MOCCAE). UAE Legislation · EAD

Abu Dhabi MRV reporting requirements: which facilities qualify?

Applicability combines location, sector and facility-level emissions. It does not automatically cover every business in Abu Dhabi.

Parameter

Current EAD framework

Business implication

Geography

Abu Dhabi

Assess physical facility location

Sectors

Industry; power/electricity and water; oil and gas; transport

Check full technical definitions

Reporting boundary

Individual facility, operational control

Do not aggregate separate facilities

Threshold

≥25,000 tCO₂e annual Scope 1

Not corporate Scope 1–3 totals

Current gases

CO₂ and CH₄

Identify both source types

Reporting period

Calendar year

Keep annual source records

Responsibility

Operator

Assign accountable personnel

Verification

Mandatory from 2027 for 2026 data

Prepare supporting evidence

Voluntary participation

Subject to EAD approval

Obtain agreement first

Industry covers material transformation and associated combustion; power includes electricity generation and desalinated-water production/distribution. Oil and gas covers activities from exploration through processing, storage and transmission. Transport covers road/rail fleets operating from an Abu Dhabi fixed base; aviation and marine transport are excluded. Standalone service businesses are excluded, but auxiliary activities supporting covered operations require boundary assessment. EAD MRV Portal

Below-threshold facilities in covered sectors must submit at least one complete year using EAD’s template. Verification is not required solely to demonstrate below-threshold status; data accuracy remains the operator’s responsibility. Outside-scope participation is voluntary and requires EAD approval. EAD MRV Portal

The operator may be an owner, lessee or delegated controller. Relevant legal, financial, operational and technical decision-making authority matters; property ownership alone does not determine responsibility. EAD Technical Guidance

Which emissions belong in the inventory?

The current facility template covers direct Scope 1 CO₂ and CH₄—not a complete corporate Scope 1, 2 and 3 inventory.

Scope

Meaning

Example

Current EAD treatment

1

Direct owned/controlled sources

Boiler fuel, process CO₂, methane leaks

CO₂/CH₄ within applicable boundary

2

Purchased energy emissions

Electricity, steam, heat, cooling

Outside current facility template

3

Other value-chain emissions

Purchased goods, business travel

Outside current facility template

EAD Workshop · GHG Protocol

A broader carbon footprint serves different needs:

Area

EAD facility MRV

Corporate carbon footprint

Purpose

Regulatory reporting

Corporate emissions management/disclosure

Basis

EAD requirements

Selected standards and reporting obligations

Boundary

Facility operational control

Defined organisational/value-chain boundary

Applicability

Sector/threshold conditions

Reporting objective or applicable obligation

Scopes

Current Scope 1

May cover Scopes 1–3

Gases

Current CO₂/CH₄

Broader applicable GHG coverage

Method

EAD guidance/template

GHG Protocol/ISO-aligned accounting

Audience

EAD

Management, customers, investors

Verification

EAD transition and eligibility rules

Applicable programme/assurance requirements

Use

Facility compliance

Strategy, disclosure, reductions

Neither inventory automatically replaces the other. ISO 14064-1 supports organisational inventories; the GHG Protocol Corporate Standard and supplementary guidance support corporate accounting. ISO 14064-1 · GHG Protocol

What is an emissions measurement plan?

A monitoring plan explains how the facility identifies, measures or calculates, controls and records its emissions. It is not the completed annual emissions report.

EAD’s currently linked guidance—Revision 02, 27 February 2026—calls for facility descriptions, emission sources, methods, data collection, equipment, QA/QC and record-keeping. It specifies submission within 90 days of registration, subsequently by 31 March annually, and revised plans within 30 days of significant changes. Confirm transition-specific audit arrangements with EAD. EAD Technical Guidance

Assign a data owner to each source and document factors, units, assumptions and change controls. Use current EAD guidance and the official template rather than inventing a mandatory plan format.

How should facilities collect and calculate emissions?

Map boilers, furnaces, generators, process equipment, fleet fuel use and relevant methane sources. Gather consumption records, meter readings and applicable production/material data. Depending on methodology, evidence may include invoices, stock reconciliations, calibration certificates, laboratory results and operating logs; not every example is universally mandatory.

EAD guidance supports calculation-based methods using activity data and factors; measurement-based methods using emissions concentration and flow; and mass balances tracking carbon inputs and outputs. Justified fallback approaches have conditions. Select methods for the actual sources, document them in the monitoring plan and prevent double-counting. EAD Technical Guidance

Common readiness gaps include purchases mistaken for consumption, omitted generators, inconsistent units, unsupported factors, expired calibration and undocumented spreadsheet changes. Address them through reconciliation, source registers, factor references, equipment checks and version-controlled calculations.

When are reports and verification due?

The standing guidance requires annual submission by 31 March. Reporting Year 2026 means emissions during 2026, submitted in 2027—not a March 2026 submission.

Date/period

Development

Business significance

2024

EAD system established; federal law issued

Earlier programme foundation

2025

First reporting cycle identified by workshop

Programme predates resolution

31 March 2026

Standing deadline for 2025 emissions

Historical deadline

21 September 2026

Resolution announcement published

Verification framework strengthened

Reporting Year 2026

First mandatory-verification reporting year

Verification applies in 2027

31 March 2027

Deadline under standing annual rule

Recheck EAD for updated instructions

EAD Guidance · EAD Workshop · Official Announcement

The March 2026 workshop mentioned grace through 14 April. Do not assume this extension applies in 2027. The portal submission form still references Reporting Year 2025 and earlier backfill: confirm when EAD enables the 2026 cycle. EAD Workshop · EAD Portal

Register facility/contact details, download current files and submit one template per facility per reporting year. EAD treats submitted information as confidential; the operator retains responsibility for its integrity. EAD MRV Portal

Who can independently verify the report?

Use a verifier meeting EAD’s applicable registration, accreditation, competence and independence requirements. External accreditation and EAD scheme eligibility are separate checks; a consultancy or general ISO certificate does not establish approval.

ISO 14065 addresses verification bodies, ISO/IEC 17029 their general conformity-assessment requirements, and ISO 14064-3 verification of GHG statements. The February guidance also recognises a specified MOCCAE-list route; confirm its continuing acceptance and the verifier’s current sector scope with EAD before appointment. The complete post-resolution registration procedure was not established from the retrieved public materials. EAD Guidance · ISO 14065 · ISO 14064-3

Inventory preparation and internal validation are not independent verification.

What should businesses do now?

Use this readiness sequence:

  • Screen each facility’s location, sector, operator and annual emissions.
  • Establish boundaries and map CO₂/CH₄ sources.
  • Document monitoring methods and responsible data owners.
  • Collect activity data and reconcile supporting evidence.
  • Calculate emissions; review units, factors and completeness internally.
  • Engage an eligible verifier early and resolve findings before final submission.
  • Submit through EAD’s current process; maintain correction logs and records.

Verification must support the submitted report where required—not become an after-submission formality. Article 6 requires designated sources to retain measured-emissions records for five years from each analysis. Use the companion applicability/readiness checklist below as an internal aid, not regulatory approval. UAE Legislation, Article 6

How QRServes can support preparation

QRServes Global LLC combines Quality, Regulatory, Sustainability and Training services, with Dubai-based operations. Its sustainability reporting service confirms Scope 1–3 inventories following the GHG Protocol Corporate Standard and ISO 14064-1. Its sustainability consulting and sustainability training support broader capability development.

These verified services provide a basis for discussing facility data preparation, documentation and readiness needs under an agreed engagement scope. They do not establish EAD authorisation or independent-verifier status. Corporate ESG framework selection is also distinct from facility reporting.

1. What is Abu Dhabi Resolution No. 03 of 2026?

An EAD instrument strengthening GHG MRV, operator obligations and verifier registration/accreditation.

Abu Dhabi facilities in covered sectors meeting the ≥25,000 tCO₂e annual Scope 1 threshold, with additional below-threshold applicability submissions

No. Sector, location and applicability conditions matter; standalone service activities are excluded.

The annual direct-emissions threshold, expressed as tonnes of CO₂ equivalent—not energy consumption or turnover.

Facility level. Consolidated group totals do not replace separate facility assessments.

Its verified inventory, reporting, consulting and training capabilities support a preparation discussion—not a claim of accredited verification.